Paver Base Calculator

Tons of gravel base and bags of bedding sand under pavers, at the right depth for the job.

ft
ft
Project (sets the base depth)
%
$/ton
Paver base4.84 tons

compacted, 10% extra included

Base volume
2.87 cu yd
Base depth
4 in
Base area (with edges)
211 sq ft
Bedding sand (1 in)
36 bags of sand (0.5 cu ft)
Sand volume
17.6 cu ft

How it works

Base tons = (length + 2 × depth) × (width + 2 × depth) × depth (ft) ÷ 27 × 1.69 · sand = area × 1 in

Example: Length 16 ft · Width 12 ft · Project (sets the base depth) walkway · Extend the base past the edges true · Extra 10% → 4.84 tons (base volume: 2.87 cu yd, base depth: 4 in, base area (with edges): 211 sq ft, bedding sand (1 in): 36 bags of sand (0.5 cu ft), sand volume: 17.6 cu ft).

Pavers rest on 1 inch of bedding sand over a layer of compacted crushed gravel. The Interlocking Concrete Pavement Institute asks for at least 4 inches of base under walkways and patios, 6 inches under a home driveway, and more on soft clay soils or where the ground freezes deeply.

Extend the base past the edges by at least its own depth so the edge restraint sits on solid ground. A 16 × 12 ft patio with 4 inches of base becomes 16.67 × 12.67 ft of base: 70.4 cubic feet, 2.6 cubic yards, about 4.4 tons, or 4.8 tons with 10% extra. The 1 inch of sand takes 16 cubic feet, 36 bags of 0.5 cubic feet with extra.

Lay and compact the base in 3 to 4 inch layers with a plate compactor, slightly damp. Total excavation is base + 1 in of sand + the paver thickness (often 2-3/8 in).

Questions

How much base do I need under pavers?

At least 4 in compacted under a patio or walkway, 6 in under a driveway (ICPI).

How many tons of paver base for a 12x16 patio?

About 4.8 tons at 4 in with the base extended and 10% extra.

How thick should the sand be under pavers?

About 1 in of screeded bedding sand.