Crusher Run Calculator

Tons and cubic yards of crusher run (crush and run) for a driveway, patio or shed base.

ft
ft
in

4 in for walkways and patios, 6 in or more for driveways.

Weight basis
%

About 5% for uneven ground; use 25% more if you chose the loose volume.

$/ton
Crusher run10.9 tons

5% extra included

Volume
6.48 cu yd
Cubic feet
175 cu ft
Area covered
500 sq ft

How it works

Tons = length × width × compacted depth (ft) ÷ 27 × 1.69

Example: Rectangle, Length 50 ft · Width 10 ft · Depth 4 in · Weight basis compacted · Extra 5% → 10.9 tons (volume: 6.48 cu yd, cubic feet: 175 cu ft, area covered: 500 sq ft).

Crusher run (also called crush and run, dense grade aggregate or road base) is crushed stone mixed with stone dust, so it packs into a hard base. Multiply length, width and depth in feet, divide by 27 for cubic yards, then multiply by about 1.69 tons per cubic yard: the depth you measure is the finished, compacted layer, and crusher run packs down by about 20–25% from the loose pile the truck delivers.

A 50 × 10 ft driveway at 4 inches compacted holds 6.17 cubic yards, about 10.4 tons, or 10.9 tons with 5% extra for uneven ground. Loose crusher run weighs only about 1.35 tons per cubic yard, so if you order by the yard, order about 25% more yards than the finished volume. Ask your supplier for their own weight per yard.

Use 4 inches under walkways, patios and sheds, and 6 to 8 inches for driveways, laid in 2–3 inch layers and compacted with a plate compactor.

Questions

How many tons of crusher run in a yard?

About 1.7 tons per compacted cubic yard; loose, as delivered, about 1.35 tons.

How much crusher run do I need for a driveway?

About 1 ton per 48 sq ft at 4 inches compacted; a 50 × 10 ft driveway needs about 11 tons with extra.

How deep should crusher run be?

4 inches for patios and walkways, 6 to 8 inches for driveways.